When and where revalidation is required?
Revalidation
means that the original validation program should be repeated at a
predetermined frequency. This work is carried out 3 years interval & any
change of critical steps or process.
i. Changes in raw materials (Physical parameters
such as viscosity, density, moisture & Particle size distribution) may
affect the products & process
ii.
Changes in the sources of active raw
materials manufacturer
iii.
Changes in the packaging materials
(Primary packaging/Closure system)
iv. Changes in the processes (e.g. mixing
time, dry time, drying temp.& batch size)
v.
Changes in the equipment (e.g. addition
of automatic electric system)
vi. Changes in the plant or facility
vii.
Variation revealed by trend analysis.